Box to Wrist: The Master Workflow
Author: Funny Items
Release time: 2026-08-25 18:45:09
View number: 12
From Box to Wrist: The Full Workflow
Your parts have arrived. Here is the complete workflow from unboxing to first wear — condensed into one page.
Phase 1: Inventory (30 min)
- Unbox and verify every part against your order — see our compatibility checklist
- Log each item in your inventory system (see our organization guide)
Phase 2: Dry Fit (1 hour)
- Open the case — see our opening methods
- Seat the movement in its ring — see our ring guide
- Test-fit the dial using the "frames a number" check — see our alignment guide
Phase 3: Assembly (2–3 hours)
- Mount dial (feet or dots)
- Press hands at true 12:00 — hour, minute, second (see our hands guide)
- Run the five tests — see our testing checklist
- Install fresh gaskets, close the case
Phase 4: Finish (1 hour)
- Fit bezel and insert — see our insert guide
- Attach strap — spring bar basics in our spring bar guide
- Set time, wind fully, wear it
Frequently Asked Questions
Total realistic time for first build?
An unhurried afternoon. Experienced builders finish this scope in under two hours.
